Kitchen remodel: planning the budget, the contract and the financing

A kitchen under renovation with white cabinets
Photo by immo RENOVATION on Unsplash

A kitchen remodel combines cabinetry, plumbing, electrical work, flooring and appliances in one room. Small decisions add up fast, so plan the scope before you collect prices.

Where the money goes

  • Cabinets are usually the largest line. Stock, semi-custom and custom cabinets can differ several times over in price.
  • Countertops vary widely by material and by the number of cut-outs and seams.
  • Appliances range from a basic set to a professional-style range that costs as much as the cabinets.
  • Layout changes. Moving the sink, the range or a wall means new plumbing, gas, electrical and sometimes structural work.
  • Labor and permits.

Choose a level of remodel

  1. Refresh. Paint or reface cabinets, new counters, hardware and lighting. Same layout.
  2. Replace in place. New cabinets and appliances, same positions for plumbing and gas.
  3. Reconfigure. New layout, walls moved, everything new.

Each step up roughly multiplies cost and time. Many kitchens that feel dated work fine at level one or two.

Write the scope before the quotes

List cabinet type, counter material, the appliances you are keeping and buying, flooring, lighting and what moves. Give the same list to at least three contractors. The FTC advises getting multiple written estimates and questioning large differences.

Ask for an allowance schedule: the amount included for each item you have not chosen yet. Low allowances are the most common reason a kitchen ends up over budget.

The contract

The FTC says a home improvement contract should include:

  • the contractor’s name, address, phone and license number,
  • estimated start and completion dates,
  • every promise about work and materials, in writing,
  • no blank spaces.

Agree how changes are handled. A signed change order with a price, before the work is done, prevents arguments.

Tie payments to milestones such as cabinets delivered and counters installed. Some states cap down payments. Keep the final payment until the punch list is done.

Paying for it

Be careful with financing arranged by the contractor. The FTC warns about contractors who steer you to a lender they know. If you are considering a home equity loan or line of credit, remember your home is the collateral. Compare the APR, fees and whether the rate is fixed or variable from more than one lender.

Older homes

If your home was built before 1978, cutting into walls and removing old cabinets can disturb lead-based paint. The EPA recommends using a lead-safe certified firm.

Living through it

A full kitchen remodel can take weeks to months. Set up a temporary kitchen with a microwave, kettle and refrigerator, and order long-lead items such as cabinets and appliances before demolition starts.

The takeaway

Pick the level of remodel, fix the scope and allowances in writing, compare three itemized bids and shop for financing separately from the contractor.

Sources

  1. How To Avoid a Home Improvement Scam · Federal Trade Commission
  2. Home Equity Loans and Home Equity Lines of Credit · Federal Trade Commission
  3. Renovation, Repair and Painting Program: Consumers · U.S. Environmental Protection Agency

This guide is general information, not financial, legal or insurance advice. Rules, prices and availability vary by state and change over time. Check details with the provider or an official source before you decide.